Where it comes from
One of Ohno's original seven wastes at Toyota, and the one that just-in-time production was designed to expose and drain away.
46 improvements
Reducing excess stock, work-in-process, and stored clutter that hides problems and ties up space.
One of Ohno's original seven wastes at Toyota, and the one that just-in-time production was designed to expose and drain away.
Excess stock ties up cash and floor space, ages or spoils, and hides the real problems (breakdowns, defects, long changeovers) that a leaner buffer would force into the open.