Where it comes from
One of the seven wastes (muda) named by Taiichi Ohno as he built the Toyota Production System in Japan between the late 1940s and the 1970s.
19 improvements
Shortening how far materials and products travel between operations to save time and handling.
One of the seven wastes (muda) named by Taiichi Ohno as he built the Toyota Production System in Japan between the late 1940s and the 1970s.
Every extra move costs time, fuel, and handling, and each touch is a chance to damage or lose the product, none of which the customer will pay for.